Scottish Parliament BuildingHolyroodEnric Mirallespost-modern architectureEdinburgh

Scottish Parliament Building: A Masterpiece of Post-Modern Architecture

Scottish Parliament Building The Scottish Parliament Building, often referred to as Holyrood, serves as the seat of the national parliament of Scotland. Located in Edinburgh, this strikin...

Scottish Parliament Building

The Scottish Parliament Building, often referred to as Holyrood, serves as the seat of the national parliament of Scotland. Located in Edinburgh, this striking complex is a landmark of post-modern architecture, designed to reflect the identity and spirit of a devolved Scotland. Inaugurated on October 9, 2004, the building is not only a center of political power but also a subject of significant architectural debate and acclaim.

The complex is situated at the foot of the Royal Mile, blending modern structural innovation with the natural landscape of Edinburgh.

The Scottish Parliament Building with Calton Hill in the background
The Scottish Parliament Building with Calton Hill in the background

Key Facts

The Committee Rooms of the Scottish Parliament reflect the unique architectural style of Miralles, which has won much critical acclaim.
The Committee Rooms of the Scottish Parliament reflect the unique architectural style of Miralles, which has won much critical acclaim.
  • Location: Edinburgh, Scotland (EH99 1SP).
  • Architects: Enric Miralles and Benedetta Tagliabue (EMBT), in collaboration with RMJM (Scotland) Ltd.
  • Construction Period: Started in June 1999; inaugurated in October 2004.
  • Final Cost: Approximately £414.4 million.
  • Major Award: Winner of the 2005 Stirling Prize.
  • Architectural Style: Post-modern.

Architectural Design and Inspiration

The design of the Scottish Parliament Building is deeply symbolic, intended to evoke the Scottish landscape and culture. The roofline, for instance, was designed to mirror the crags of the Scottish highlands and the shapes of upturned fishing boats.

Roof line of the Parliament intended to evoke the crags of the Scottish landscape and, in places, upturned fishing boats. Solar panels can also be seen, part of the building's sustainability strategy.
Roof line of the Parliament intended to evoke the crags of the Scottish landscape and, in places, upturned fishing boats. Solar panels can also be seen, part of the building's sustainability strategy.

One of the most distinctive influences on the building is the art of Henry Raeburn. The windows of the MSP (Member of the Scottish Parliament) building were inspired by Raeburn's painting, The Skating Minister. This influence extends to the "trigger panels," which act as abstract representations of the painting or as functional curtains.

The distinctive windows of the MSP building inspired by Henry Raeburn's painting The Skating Minister
The distinctive windows of the MSP building inspired by Henry Raeburn's painting The Skating Minister

Henry Raeburn's painting of The Skating Minister
Henry Raeburn's painting of The Skating Minister

"Trigger panels" as either an abstract of The Skating Minister or curtains drawn back from the windows
"Trigger panels" as either an abstract of The Skating Minister or curtains drawn back from the windows

Sustainability and Innovation

Sustainability was a core component of the building's strategy. This is evidenced by the integration of solar panels on the roof and the use of natural materials that blend the structure into its environment.

The Parliamentary Complex

The complex consists of several specialized areas designed for governance, administration, and public engagement. The layout is designed to be accessible and transparent, reflecting the democratic nature of the institution.

An aerial view of the Scottish Parliament Building complex. The red tiles of Queensberry House are visible between the MSP Office block at the back of the complex and the Tower and Canongate Buildings at the front which house the debating chamber and committee rooms.
An aerial view of the Scottish Parliament Building complex. The red tiles of Queensberry House are visible between the MSP Office block at the back of the complex and the Tower and Canongate Buildings at the front which house the debating chamber and committee rooms.

The Debating Chamber

Unlike the adversarial, facing-bench layout found in Westminster-style legislatures, the debating chamber in Holyrood uses a hemicycle (a semi-circular seating arrangement). This design is intended to foster cooperation and consensus among members.

The debating chamber, where seating is arranged in a hemicycle rather than the adversarial layout of other Westminster style legislatures
The debating chamber, where seating is arranged in a hemicycle rather than the adversarial layout of other Westminster style legislatures

Debating chamber, showing the viewing gallery and roof construction
Debating chamber, showing the viewing gallery and roof construction

The chamber features specialized seating consoles for MSPs, blending high-tech functionality with the building's unique aesthetic.

Detail of the MSPs' seating consoles
Detail of the MSPs' seating consoles

Public and Administrative Spaces

The complex includes the Garden Lobby, a central hub that connects various parts of the building, and the Canongate Building, which houses committee rooms. The Canongate Wall is particularly notable for its inscriptions of quotations carved into rock.

Interior view of the garden lobby
Interior view of the garden lobby

Canongate Wall
Canongate Wall

The Canongate Wall façade of the parliamentary complex has quotations inscribed onto pieces of rock.
The Canongate Wall façade of the parliamentary complex has quotations inscribed onto pieces of rock.

The MSP building provides offices for members, featuring unique "pods" that offer a distinct workspace for each representative.

Design detailing on the MSP "pods" located in each of the MSPs offices
Design detailing on the MSP "pods" located in each of the MSPs offices

The overall layout is comprehensive, encompassing the main staircase, the press tower, and landscaped parks that integrate the building with the surrounding city.

1 Public Entrance 2 Plaza 3 Pond 4 Press Tower 5 Debating Chamber 6 Tower one 7 Tower two 8 Tower three 9 Tower four 10 Tower five, Cannongate Bldg. 11 Main Staircase 12 MSPs' Entrance 13 Lobby 14 Garden 15 Queensberry House 16 MSP building 17 Turf roof 18 Carpark and vehicular entrance 19 Landscaped park
1 Public Entrance 2 Plaza 3 Pond 4 Press Tower 5 Debating Chamber 6 Tower one 7 Tower two 8 Tower three 9 Tower four 10 Tower five, Cannongate Bldg. 11 Main Staircase 12 MSPs' Entrance 13 Lobby 14 Garden 15 Queensberry House 16 MSP building 17 Turf roof 18 Carpark and vehicular entrance 19 Landscaped park

Construction History and Controversy

The journey from conception to completion was fraught with challenges. Construction began in June 1999, but the project became a focal point of public controversy due to significant design changes and escalating costs.

Construction progress by April 2001
Construction progress by April 2001

Scottish Parliament Building under construction in January 2003
Scottish Parliament Building under construction in January 2003

The financial trajectory of the project saw the estimated cost rise from an initial range of £10–40 million in 1997 to a final cost of over £414 million. This discrepancy led to the Fraser Inquiry, a formal investigation into the management of the project.

The unique architecture of the Scottish Parliament was complicated by design changes and cost increases.
The unique architecture of the Scottish Parliament was complicated by design changes and cost increases.

Cost Increase Timeline

Evolution of Project Costs (1997–2007)
Date Estimated/Final Cost
July 24, 1997 £10–40 million
June 17, 1999 £109 million
November 2001 £241 million
September 2003 £400 million
February 2004 £430 million+
February 2007 £414.4 million (Final)

Frequently Asked Questions

Who designed the Scottish Parliament Building?

The building was designed by architects Enric Miralles and Benedetta Tagliabue of the firm EMBT, in collaboration with RMJM (Scotland) Ltd.

Why is the seating in the debating chamber different from the UK Parliament?

The chamber uses a hemicycle (semi-circular) layout rather than an adversarial layout to encourage a more collaborative and less confrontational political environment.

What is the significance of the Stirling Prize?

The building won the 2005 Stirling Prize, which is one of the most prestigious awards in architecture, recognizing the building's unique design and contribution to the field.

What caused the controversy surrounding the building's cost?

The project experienced massive cost overruns, growing from an initial estimate of under £40 million to over £414 million, which led to a public inquiry known as the Fraser Inquiry.

What inspired the windows of the MSP building?

The windows were inspired by the painting The Skating Minister by Henry Raeburn, reflecting a desire to integrate Scottish art and culture into the architecture.

References

  1. Scots: Scots Pairlament Biggin; Scottish Gaelic: Pàrlamaid na h-Alba[1]
  2. "Dachaigh : Pàrlamaid na h-Alba". Scottish Parliament. Archived from the original on 17 May 2016. Retrieved 17 June 2016.
  3. Johnson, Simon (14 January 2010). "Scottish Parliament costs taxpayers £72 million per year". The Daily Telegraph. Archived from the original on 25 September 2015. Retrieved 17 September 2015.
  4. "The New Scottish Parliament at Holyrood" (PDF). Audit Scotland, Sep 2000. Archived from the original (PDF) on 6 December 2006. Retrieved 10 December 2006.
  5. "Opening of Holyrood". Scottish Parliament. Archived from the original on 4 May 2006. Retrieved 29 October 2006.