2024 Summer Olympics Field Hockey Venue Transformation
The landscape of sports infrastructure in France has seen a significant evolution in preparation for the 2024 Summer Olympics. A comprehensive renovation project, spanning from 2021 to 2023, has transformed a historic site into a state-of-the-art complex designed to meet the rigorous demands of international competition and long-term athletic development.
Designed by the architectural firm Celnikier et Grabli Architectes and executed by the construction group Léon Grosse, the project reached completion in December 2023. This modernization ensures that the venue is not only a stage for Olympic glory but also a sustainable hub for French sports.

A Modern Hub for Field Hockey and Beyond
The newly renovated complex serves as the official home for the French Field Hockey Federation and its national training center. Central to this facility are two floodlit synthetic pitches used during the Olympic tournament. One of these pitches is complemented by a 1,000-seat stand and a dedicated building housing administrative offices, meeting rooms, and changing facilities.
Beyond field hockey, the site has been expanded to support a variety of disciplines. The complex now includes seven new pitches dedicated to football and rugby union, ensuring the facility remains versatile for various sporting needs.
Stadium Evolution and Capacity
One of the most striking changes occurred at the legendary main pitch. To optimize the space for the 2024 Games, the famous Olympic athletics track was removed. In its place, a small 200-meter ring—intended solely for warming up—was relocated a few hundred meters away. Consequently, the main stadium is no longer equipped for athletics competitions, with the remaining track facilities reserved for local schools and associations.
The stadium's infrastructure has been significantly upgraded to enhance the spectator experience:
- The historic grandstand received new seating, increasing its capacity to 6,000 spectators.
- With the addition of temporary grandstands for the 2024 Olympic Games, the stadium's total capacity reaches approximately 9,500 seats.
- The traditional natural grass pitch was replaced with a high-performance blue synthetic pitch.
When considering the entire sports complex, the total spectator capacity for the 2024 Summer Olympics is approximately 13,500.
Investment and Future Legacy
The total investment for this ambitious project amounted to 101 million euros. This budget was jointly financed by the Hauts-de-Seine department and the Olympic Works Delivery Company, known as Solidéo.
The vision for the site extends far beyond the closing ceremony of the Olympics. The venue is designed for long-term residency, with plans for the field hockey and football sections of the Racing Club de France to become resident clubs. Additionally, Racing 92 is expected to utilize the facility for training and select rugby union matches.
| Feature | Detail |
|---|---|
| Total Project Cost | 101 million euros |
| Completion Date | December 2023 |
| Total Complex Capacity | ~13,500 spectators |
| Main Stadium Capacity | ~9,500 (including temporary stands) |
| Pitch Surface | Blue synthetic pitch |
| Funding Bodies | Hauts-de-Seine and Solidéo |
Key Facts
- Renovation Period: The site was completely renovated between 2021 and 2023.
- Architects: Designed by Celnikier et Grabli Architectes and built by Léon Grosse.
- Infrastructure: Includes two floodlit synthetic hockey pitches and seven football/rugby pitches.
- Athletics Change: The main athletics track was removed, leaving only a 200m warm-up ring.
- Resident Clubs: Future home to Racing Club de France (hockey and football) and Racing 92 (rugby).
Frequently Asked Questions
Who financed the renovation of the sports complex?
The project's 101 million euro budget was funded by the Hauts-de-Seine department and the Olympic Works Delivery Company (Solidéo).
Can athletics competitions still be held at the main stadium?
No. The Olympic athletics track was removed to make way for other upgrades, and the remaining 200m ring is only suitable for warming up and use by schools and associations.
What is the total spectator capacity of the complex during the Olympics?
The entire sports complex can accommodate around 13,500 spectators during the 2024 Summer Olympics.
What happened to the natural grass pitch?
The natural grass pitch was replaced by a brand new blue synthetic pitch to meet the requirements of the tournament.
Which organizations will use the facility after the Olympics?
The complex will house the French Field Hockey Federation's national training center, and will eventually host the Racing Club de France (football and hockey sections) and Racing 92 (rugby union).