Daegu Metro Line 1Daegu Transit CorporationSouth Korea rapid transitDaegu subway stationsDaegu transportation

Daegu Metro Line 1: A Comprehensive Overview of the Scarlet Rapid Transit Line

Daegu Metro Line 1: A Comprehensive Overview of the Scarlet Rapid Transit Line Daegu Metro Line 1 serves as a vital artery for the metropolitan city of Daegu, South Korea. Identified by i...

Daegu Metro Line 1: A Comprehensive Overview of the Scarlet Rapid Transit Line

Daegu Metro Line 1 serves as a vital artery for the metropolitan city of Daegu, South Korea. Identified by its distinctive scarlet color, this rapid transit line provides essential connectivity across the region, linking various districts from the southwestern reaches to the eastern edges of the city and beyond.

Operated by the Daegu Transit Corporation, Line 1 was the city's sole rapid transit system until the mid-2005 introduction of subsequent lines. Today, it remains a cornerstone of the local transportation network, facilitating daily commutes for thousands of residents and visitors alike.

Key Facts

  • Termini: Seolhwa-Myeonggok to Hayang
  • Total Length: 37.1 km (23.1 mi)
  • Number of Stations: 35
  • Line Color: Scarlet
  • Operating Speed: 80 km/h (50 mph)
  • Track Gauge: 1,435 mm (Standard Gauge)

History and Development

The history of Daegu Metro Line 1 is marked by steady expansion and significant milestones. The line first commenced operations on November 26, 1997, initially running the section between Jincheon and Jungangno. Shortly after, on May 2, 1998, the segment from Jungnangno to Ansim was opened to the public.

The network continued to grow, with the western end extending from Jincheon to Daegok by May 10, 2002. While the line faced a period of service suspension in 2003 following the Daegu subway fire, it has since maintained robust operations. The most recent major expansion occurred on September 8, 2016, with the opening of a southwestern extension.

![ไม่มีภาพประกอบ]

Technical Specifications and Service

Line 1 utilizes a 1500 V DC overhead electrification system and operates on a dual-track configuration. The rolling stock used for these services is the Hanjin 1000-series, which manages the transit across the 37.1 km route. The system is supported by the Ansim Depot, which serves as the primary maintenance and storage facility.

In terms of frequency, the service is highly reliable. As of 2011 data, trains run approximately 312 times per day during the week and 288 times on weekends and holidays. A full journey from one end of the line to the other takes approximately 50 minutes and 30 seconds.

Station Summary

Overview of Major Line 1 Segments and Termini
Segment/Terminus Key Stations Total Distance (km)
Western End Seolhwa-Myeonggok, Hwawon, Daegok 2.6
Central Hubs Banwoldang, Jungangno, Daegu Station 14.6
Major Transit Junction Dongdaegu Station 17.5
Eastern Extension Ansim, Buho, Hayang 37.1

Station List

The line consists of 35 stations. For most stations, train doors open on the right side upon arrival, with the exception of Ansim Station. The stations are listed below from west to east:

  1. Seolhwa-Myeonggok
  2. Hwawon
  3. Daegok
  4. Jincheon
  5. Wolbae
  6. Sangin
  7. Wolchon
  8. Songhyeon
  9. Seobu Bus Terminal
  10. Daemyeong
  11. Anjirang
  12. Hyeonchungno
  13. Yeungnam Univ. Hospital
  14. Nat'l Univ. of Education
  15. Myeongdeok
  16. Banwoldang
  17. Jungangno
  18. Daegu station
  19. Chilseong Market
  20. Sincheon
  21. Dongdaegu Station
  22. Dong-gu Office
  23. Ayanggyo
  24. Dongchon
  25. Haean
  26. Bangchon
  27. Yonggye
  28. Yulha
  29. Singi
  30. Banyawol
  31. Gaksan
  32. Ansim
  33. Daegu Haany University Hospital
  34. Buho
  35. Hayang

Frequently Asked Questions

How long does it take to travel the entire length of Line 1?

A complete trip from one end of the line to the other takes approximately 50 minutes and 30 seconds.

Which company operates the Daegu Metro Line 1?

The line is operated by the Daegu Transit Corporation.

Does Line 1 connect to major train services?

Yes, Line 1 provides transfers to Saemaul-ho and Mugunghwa-ho services at both Daegu Station and Dongdaegu Station.

What is the total length of the line?

The total line length is 37.1 kilometers (23.1 miles).

Which side do the doors open on?

At almost all stations, the train doors open on the right side when arriving, except at Ansim Station.